Sunday, June 29, 2008

marking and moving

This weekend I marked all the 4 x 4's and moved them over to crew mate Laurie Geissinger's property where she's been kind enough to host the full build out of the project. The last image of this post is Laurie clearing one of her meadows with "Lucky" to make a space for the project. The marks indicate the where the pieces will rest on one another and are critical in maintaining the alignment of the pattern as the installation grows larger.

If all goes as planned, we'll build two weekends from now on July 12.



Sunday, June 1, 2008

a few more schemes

Here are a few more schemes I assembled this Saturday. The first images are of Leonardo's bridge design. This one is not very stable. The large hex/small triangle scheme was a little difficult to assemble due to the way the 4 x 4's lay on one another at the small triangle intersection. The last one is the rectangle scheme I built previously using the 12' long 4 x 4's. This one appears to be much stronger with a lot less bowing. I'm really looking forward to the full build of these ideas!